The Industrial Scribe · solutions

Agentic AI:
The Lean Machine.

Walk any part of your work. It finds the waste, cleans it up, fixes the real cause, and keeps it that way.

Watch it workOne minute. An invented factory and numbers, shortened from the tool's own worked example.
Claude Codelean-machine

lean machine. The changeover on machine 3 takes forever.

Shop floor. Let us go and see. From the last good part of the old job to the first good part of the new one, how long?

95 minutes. About 12 times a month.

Walk me through those 95 minutes, one step at a time. I will keep asking.

Adding up the hours with a script

StepHours a monthWaste
Walk to the tool crib, 3 trips3.0 hWalking
Search the rack for the fixture2.0 hSearching
Ask which revision, load it from USB4.0 hWaiting
Set the work offsets3.0 hReal work
First-article check: 20 min waiting for QC, 5 min checking5.0 hWaiting, then real work
Adjust and run again2.0 hDo it again

The changeover takes 19 hours a month.

About RM 2,280 of machine time, at your RM 120 an hour. An estimate from your answers.

bench-machine-3.jpgHere is a photo of the bench.

Scoring 5S from the photo

Sort112 loose tools. A torque wrench with a broken handle.
Set in order1No labels. No shadow board.
Shine2Chips under the vice.
Standardize0No written changeover standard.
Sustain?CHECK A photo cannot show who owns this bench. You tell me.

5S so far: 4 out of 20.

The biggest waste is waiting: 8 hours a month. So I ask why.

Why?QC takes 20 minutes to come.

Why?Nobody tells QC in advance.

Why?There is no "first article ready" signal.

Why?The changeover was never written down as a standard.

Real cause: no standard, so no signal.

Nobody is blamed. A missing signal can be fixed.

Cut first. No tool needed yet.

•Stage the tools for the next job at the machine while the old job still runs.

•A labelled slot for each fixture.

•The approved revision goes on the job sheet. Engineering confirms it.

•A "first article ready" card on the machine, so QC comes on time.

The first-article check itself stays. Only the waiting before it is cut.

Writing the one-page changeover standard

Then one thing to automate: a prompt that drafts the kit list from the job sheet.

Writing your one-page Lean Plan

Lean Plan · changeover on machine 3
Problem95 minutes, 12 times a month: 19 hours, about RM 2,280.
WasteWaiting 8 h · walking and searching 5 h · running again 2 h.
Real causeNo standard, so no signal to QC.
What ifCut only the QC wait: 75 minutes a changeover, 4 hours back a month. Not a promise.
ActionsCut first. Then the standard. Then automate.
CheckTime every changeover for two weeks. Score the 5S again in a month.

Owners and dates are yours to set. I marked them CHECK. Shall I save this to your factory memory?

Yes.

Saved to your factory memory

Next time, I start from what worked on machine 3.

Reply to Claude…↑

Walk one part of your work.It finds the waste, fixes the real cause, and keeps it lean.

Get it USD 9.99 once

In a free AI chat it walks you through the same steps. In Claude Code it also reads your files and photos, and remembers your factory.

0:00

Works as a full AI agent in Claude Code. Works as a step-by-step AI guide in any free chat.

Get it USD 9.99 once About 30 to 45 minutes with one real piece of work in front of you.

Lean, the way it is really done inside a factory. Lean is not a poster on the wall. It is walking to the machine, timing the changeover, asking "why?" five times, and writing the new way down so it does not slide back.

The hard rule: anything that leaves or commits the company (sending, approving, ordering, pricing, signing) stays your click. Changes near safety need your safety officer's OK. Cutting an inspection or traceability step needs your quality owner's OK.

Want the detail? Open any part.

The moment this is for

Something eats your hours every week. A changeover that takes forever. A drawing change that sits for days. An order that takes two weeks to ship but only two hours to make. A report you rebuild by hand. You have heard "use AI". But if you automate it as it is, you just get a faster mess.

Use it anywhere in the factory

  • Shop floor. A machine, a cell or a store: changeover time, walking trips, parts waiting, setup scrap.
  • Engineering. Drawings, programs and changes: which version is live, how long a change waits, who keeps getting asked.
  • Process flow. One real order from enquiry to payment: work time against waiting time, and every hand-over.
  • Office. Reports, data entry and chasing: what is copied, retyped and redone.

What it does, in order

  1. Your factory first. A short read of your business nature, so it knows where waste costs your kind of factory most.
  2. Go and see. It asks what really happens, one step at a time, until every step has a time and a reason. It checks your SOP against what people actually do.
  3. The waste map. Every step tagged with the lean 8 wastes, with hours per month from your own numbers. For an order, it shows the plain truth: "about 2 hours of real work in 9 days".
  4. The 5S check, scored out of 25. For a bench, a rack or a folder: Sort, Set in order, Shine, Standardize, Sustain. Send a photo and it scores what it can see.
  5. The real cause. The 5 Whys on the biggest waste, until it reaches something you can change.
  6. Cut before you automate. Remove, combine, reorder, simplify. Many hunts save hours with no tool at all.
  7. The new standard. A one-page standard and a simple visual check, so it stays lean.
  8. Automate only what is left. Each step gets a level, from "fix the template" to "an AI skill that runs on your files".
  9. Your one-page Lean Plan. The problem, the waste, the cause, what already worked in your own factory, the target, who does what by when, and the date you check again.

It learns your factory

Every hunt teaches it more about your own floor. It keeps a factory memory: your numbers, the causes that keep coming back, the fixes you tried, and whether they really worked, measured before and after.

So your next Lean Plan starts with "From your own factory": what already worked on your machine 3, ready to copy to machine 5. Proven fixes from your own floor come before any textbook idea. When the same cause shows up hunt after hunt, it tells you plainly: that is a factory-wide problem now.

Already have old records? Drop in your 5S audits, downtime logs, scrap logs or improvement sheets, and it learns from day one.

It is not secret AI training. It is plain files on your own computer that you can open, edit or delete, and nothing is sent anywhere. It writes roles, not names ("the QC inspector", "Customer A"), and saves nothing without your OK. In a free chat, it hands you a factory memory card at the end to paste in next time.

Lessons from inside a real factory

Every plan can also draw on 16 lessons from improvement work inside a real factory. A few of them:

  • Lead time is mostly waiting. Measure the wait, not just the work.
  • Split "planned to wait" from "forgotten" before you blame the floor.
  • The material kit is its own wait.
  • Capture output at the machine, with almost no typing.
  • Remove what nobody uses, even if you built it.
  • A problem needs an owner before it needs a system.

They are patterns, with no company names and no figures. It uses one only when it fits what you found, and it never presents a lesson as your own result.

It 5S's your Claude Code too

Over time Claude Code gets messy like any workbench: skills you never use, a CLAUDE.md that keeps growing, memory notes that are out of date, two tools doing the same job.

Say 5S my Claude Code. It scans your setup, read-only, and scores the 5S. Then it shows you a plan. Only after your yes does it tidy up: unused skills go to an archive folder, broken headers get fixed, CLAUDE.md is trimmed.

It never deletes anything. It keeps an undo list, and it never touches your keys, passwords, permissions or anything IT manages.

Two ways to run it

A · No install, any AI chat

Open paste-prompt.md, copy the box into a new chat, free plans included, and answer one question at a time. About 30 to 45 minutes. At the end it hands you a factory memory card to paste in next time.

B · Claude Code skill

For people who already use Claude Code (needs Claude Pro, USD 20/month). Move the folder to your skills folder, drop your SOP, an export or photos into sop-in/, and say lean machine. It reads your real files and photos, does the sums with a script, builds the fix with you and tests it on your real file, remembers your factory between hunts, and keeps a log of hours found, hours actually saved and your 5S score before and after.

What's inside the download

  • paste-prompt.md: the no-install version.
  • SKILL.md: the Claude Code skill.
  • references/insider-lessons.md: 16 lessons from inside a real factory, with no names and no figures. Worth reading on its own.
  • references/lean-by-area.md: walk questions, waste examples and 5S for the shop floor, engineering, process flow and the office, plus the 5 Whys and the one-page Lean Plan.
  • references/claude-code-5s.md: the 5S routine for your Claude Code setup.
  • scripts/claude_5s_scan.py: the read-only scan of your Claude Code setup. Plain Python, nothing to install.
  • tis-resources.md: the free and paid TIS pages it may point you to, only when one fits a finding.
  • examples/: three worked examples on invented factories, labelled EXAMPLE: an office supplier follow-up, a shop-floor changeover, and a Claude Code 5S.

The honest limits

USD 9.99once · yours to keep · every update free
Get it →

No refund guarantee: it is a download you keep, so read the honest limits above first. After payment you land on your download page; bookmark it. Stuck? Reply to your receipt and a human answers, usually within a day. Back to the solutions →